QC
QUBIT COMPUTECHEngineering Studio
Documented Field Evidence & Case Studies

Proof of Craft.
Case Studies.

Every project has a challenge, an investigation, and an engineered outcome. Here is the unedited technical record of how we solved critical failures for healthcare clinics, campuses, retail supermarkets, and educational labs.

CASE 01Hardware Engineering
Advanced Diagnostic Radiology Center

Medical Imaging Workstation Silicon BGA Restoration

Salvaged a critical $45,000 ultrasound processing console with severe BGA solder fatigue and power-rail failure, restoring full clinical operation within 48 hours.

Medical Imaging Workstation Silicon BGA Restoration
Clinical diagnostic ultrasound imaging console: proprietary DSP motherboard restored via precision BGA reballing under infrared thermal profiling.
Capital Saved
$45,000
Turnaround Time
48 Hours
Clinical Downtime Avoided
3 Weeks
Subsequent Run Hours
2,400+ hrs
01. THE CHALLENGE

A flagship multi-slice diagnostic ultrasound console suffered sudden catastrophic shutdown during patient scanning. The OEM declared the proprietary motherboard dead on arrival, quoting a replacement lead-time of 21 days from overseas at an exorbitant cost ($45,000), jeopardizing urgent clinical appointments.

02. FORENSIC INVESTIGATION

Using long-wave infrared thermal imaging under controlled current injection (0.8V / 2.5A), our engineering team isolated a dead short on the main 1.05V VCC_CORE power plane. Further stereo microscope inspection revealed solder ball migration and fractured micro-vias beneath the main signal processing DSP BGA chip, caused by 18-hour daily thermal cycling.

03. ENGINEERING SOLUTION

Rather than swapping the entire proprietary system board, we placed the unit on our computer-controlled dual-zone BGA rework station. The 1,152-ball DSP was desoldered, cleaned of oxidized lead-free SAC305 solder, and reballed with eutectic Sn63/Pb37 solder spheres for vastly improved thermal shock tolerance. Two shorted decoupling ceramic capacitors (0402 size) were replaced with high-temp rated Murata components.

04. IMPLEMENTATION & REFLOW

The chip was precision-aligned under optical prism magnification and reflowed using a custom 7-stage ramp profile. High-conductivity thermal interface material was applied, followed by 24 hours of sustained stress testing at full ultrasonic beamforming rendering workloads.

05. VERIFIED OUTCOME

The workstation returned to active clinical service with zero imaging artifacts and lower operating temperatures than factory baseline. The clinic avoided $45,000 in replacement expense and resumed patient care within two days.

FLIR Thermal DiagnosticsInfrared BGA Rework StationStereo Zoom Optical MicroscopeOscilloscope Waveform ProbeEutectic BGA Reballing
CASE 02Infrastructure
Grace Community Sanctuary & Academy

High-Density Campus Network & Church OS Deployment

Engineered a low-latency 10Gbps optical backbone with high-density Wi-Fi across an 80,000 sq ft campus and piloted the Mustard Seed Operating System.

High-Density Campus Network & Church OS Deployment
Grace Community Sanctuary: low-loss OM4 fiber optic backbone connecting 1,400 concurrent devices with zero live stream jitter.
Campus Coverage
80,000 sq ft
Concurrent Clients
1,400 Devices
Live Stream Jitter
< 2ms
Piloting Families
650 Families
01. THE CHALLENGE

The campus was paralyzed by intermittent Wi-Fi drops during 1,200-seat Sunday services, dropping critical multi-camera 4K live broadcasts. Financial tithe records were kept across fragmented spreadsheets, causing recurring reconciliation discrepancies.

02. FORENSIC INVESTIGATION

A complete RF spectrum audit discovered massive co-channel interference from legacy consumer access points installed behind concrete pillars. The main AV broadcast booth was bottlenecked by unshielded Cat5 runs passing parallel to high-voltage stage lighting cables.

03. ENGINEERING SOLUTION

We designed an end-to-end enterprise network: OM4 fiber links connecting the sanctuary, administrative wing, and youth academy to a centralized 10GbE managed switch rack. High-density Wi-Fi 6 access points were deployed with beamforming tuned to seat elevation angles.

04. IMPLEMENTATION & REFLOW

In parallel, we deployed the Mustard Seed pilot for administration: importing historical registries into an encrypted cloud database, launching member self-checkin kiosks, and setting up automated giving receipts.

05. VERIFIED OUTCOME

Live 4K broadcasts achieved zero frame drops with sub-2ms network jitter across 1,400 concurrent devices. The administration reduced weekly accounting reconciliation from 6 hours to 12 minutes.

OM4 10GbE Optical FiberEkahau RF Spectrum HeatmappingEnterprise Managed PoE+ SwitchesMustard Seed Operating SystemVLAN Segmentation & QoS Tagging
CASE 03Software Systems
Apex Retail Supermarket Chain (6 Branches)

Multi-Branch Offline-First Retail Billing & POS Migration

Replaced sluggish legacy billing terminals with Qubit Billing, reducing cashier checkout latency from 45 seconds to 9 seconds per customer.

Multi-Branch Offline-First Retail Billing & POS Migration
Apex Supermarket checkout lanes: 24 active Qubit Billing terminals delivering sub-100ms barcode scanning and 100% offline resilience.
Checkout Speed
4.8x Faster
Offline Resilience
100% Uptime
Active Tills
24 Terminals
Daily Transactions
18,000+ Items
01. THE CHALLENGE

During peak evening shopping hours, retail terminals would stall whenever cloud internet connections faltered. Cashiers had to reboot systems manually, leading to long queues, frustrated shoppers, and abandoned grocery carts.

02. FORENSIC INVESTIGATION

The legacy software made synchronous external API roundtrips for every single barcode scanned. A single 200ms latency spike caused barcode buffering and blocked the cash drawer print signal.

03. ENGINEERING SOLUTION

We migrated the chain to Qubit Billing. Built with an offline-first SQLite database running directly on each terminal's NVMe drive, barcode lookups occur in less than 3 milliseconds without touching external network connections.

04. IMPLEMENTATION & REFLOW

We deployed custom thermal print drivers with direct USB byte piping, integrated 2D QR dynamic payment generators on customer-facing secondary displays, and established background differential synchronization to central headquarters.

05. VERIFIED OUTCOME

Even when primary fiber connections are cut, billing runs seamlessly without interruption. Average checkout time dropped from 45 seconds to 9 seconds, eliminating queue congestion.

Qubit Billing EngineLocal Embedded SQLite CacheBackground Event Sync QueuesNative ESC/POS Driver IntegrationReal-time GST E-Way Engine
CASE 04Hardware Engineering
St. Jude Model Higher Secondary School

60-Seat STEM Computer Laboratory Architecture & Restoration

Revitalized 60 CAD/Robotics workstations with component restorations and established a centralized gigabit network with strict content filtering.

60-Seat STEM Computer Laboratory Architecture & Restoration
St. Jude Model Higher Secondary School: 60 restored CAD and coding workstations with centralized gigabit network booting.
Workstations Salvaged
58 of 60
Budget Saved vs New
72% Reduction
Boot Time
14s from 3.5m
Lab Uptime
99.8%
01. THE CHALLENGE

The school's STEM engineering lab was barely functional: 38 of 60 machines suffered random freezing, failing capacitors, and corrupted hard drives. The administration was facing a budget-breaking quotation to discard and purchase 60 brand new machines.

02. FORENSIC INVESTIGATION

Motherboard audits revealed degraded VRM electrolytic capacitors and clogged cooling channels caused by chalk dust. The underlying Core i7 processors and motherboards were structurally sound but starved of clean power.

03. ENGINEERING SOLUTION

We refurbished the fleet: replaced 140+ degraded capacitors with high-end low-ESR solid Japanese caps, re-pasted CPU heatsinks with ceramic compound, and upgraded system drives to enterprise SATA SSDs. We also wired a unified gigabit switch with automated PXE boot imaging.

04. IMPLEMENTATION & REFLOW

Configured a centralized server image where student environments reset cleanly on reboot, protecting the systems from accidental malware or configuration drift.

05. VERIFIED OUTCOME

The school restored their entire 60-seat lab at 28% of the cost of new equipment, providing students with instantaneous CAD and Python coding environments.

Capacitor ESR Testing & ReworkAutomated PXE Network BootEnterprise Solid ElectrolyticsCentralized Classroom FirewallCat6 Gigabit Architecture